50m MOTOR-YACHT
The work involved installing dynamic stabilizers on a 50m steel yacht.
- Site preparation
- Survey and study for stabilizers installation
- Cutting the hull plating
- Realization in the workshop the planking template
- Manufacture of shell plate incorporating stabilizer passage
- Preparation of plates and hull plating
- Blank
- Welding of the hull plates.